Difference between revisions of "Ongoing Projects"

From EucalyptusGrove
Jump to: navigation, search
(Fence Construction)
Line 18: Line 18:
 
== Fence Construction ==
 
== Fence Construction ==
  
[[Image:Fence-Construction.jpg|frame|Fence construction along Hollister]]
+
[[Image:Fence-Construction.jpg|frame|left|Fence construction along Hollister]]
  
 
* '''February 2007:''' The board approved the reconstruction of the entire fence along Hollister east of the entry gate.
 
* '''February 2007:''' The board approved the reconstruction of the entire fence along Hollister east of the entry gate.
 
  
 
== Walkway Repair ==
 
== Walkway Repair ==

Revision as of 23:06, 19 April 2007


There are several projects underway at the Grove. Here is an overview of some of the things going on.


Gym Improvements

The board is directing some attention to the improvement of the gym.

  • January 2007: A Precor elliptical trainer was donated to the association and installed in the gym.
  • March 2007: A second elliptical trainer -- a NordicTrack -- was donated and installed.
  • April 2007: The board would like to make other improvements, but first wants to solicit ideas from the association members. If you have ideas, please visit the gym and add your thoughts to the comment sheet posted there.


Fence Construction

Fence construction along Hollister
  • February 2007: The board approved the reconstruction of the entire fence along Hollister east of the entry gate.

Walkway Repair

Replacement of Defective Siding

Siding Class Action Settlement